D9.1 PREDICTED KPIS FOR DIFFERENT REFERENCES AND BATCHES

The aim of WP9 is to integrate different ICT technologies identified and already set-up in WP3, WP4 and WP5 following the specifications and requirements described in WP2. These technologies need to be proven off-line before their on-line integration and validation.

The present document constitutes the deliverable D9.1 that is described in the GA as a document that gives the predicted KPIs selected by EIPC for different references and batches to monitor the capacity of the system to achieve multi-criterial objectives.